Standard names are often used as shorthand for a test request. Before selecting a test, confirm the product, market, system level and decision the result must support.
Market and system scope
Transport, vehicle and energy-storage requirements address different risks and sample levels. The applicable edition and receiving organization matter.
Evidence already available
Cell, module and system data can build on one another. A gap analysis may show that only a limited physical test is needed—or that the existing data cannot support the intended decision.
Physical feasibility
Sample availability, transport, laboratory capability and safety controls must be considered before a protocol is finalized.